Quality proof, moved out of the footer.
A dedicated qualification experience for Burke's published AS9100D and ISO 9001:2015 registration, quality policy, and inspection support.
AS9100D & ISO 9001:2015
The current Burke site describes the business as registered to these standards and links a certificate. Certificate scope, number, registrar, and current dates should be verified before production launch.
Make the quality conversation specific.
Burke publishes a full inspection department and states that its equipment can meet required tolerances and specifications. A live site should add only verified metrology equipment, reporting, traceability, and tolerance details.
- 01
Review requirements
Drawing, revision, material, quantity, and specified documentation.
- 02
Confirm production fit
Process, equipment, inspection plan, and delivery requirements.
- 03
Quote the defined scope
A conversation grounded in the actual part rather than generic claims.
Bring us the drawing.
We'll start with fit.
Share the part, quantity, material, and target date to begin a machining conversation.
Request a Quote